Salko – Energy – EGD Liner Plate Fabrication

The end client engaged with Salko to design, procure, manufacture, and deliver x50 EGD1 liner plates for their EGD1 Insulation upgrades on GT26 Exhausts in 2023 and 2024.

 

The objective for the client is to have 5 fully fabricated sets (50 liner plates in total) to install during their C-Inspections in 2023 and 2024.

View full case study read more

Salko Commercial – Greenland seeds

Salko UK provided and completed Mechanical and Electrical scope of works on the office area, warehouse, and external lighting delivered to estimated budgets, Quality and programme constraints whilst working with the wider design team, principal contractor and building control operatives.

View full case study read more

Salko – Energy – Segment Factory

The end client engaged with Salko to assist with provision of Mechanical and Electrical support for their newly acclaimed Cast Segment Facility.

 

The objective for the client was to construct a fully functioning precast concrete segment facility for tunnelling construction across the UK.

View full case study read more

Salko Energy – GT 26 Exhaust Gas Housing Repairs

Salko was engaged by the end client to complete critical Exhaust Gas Housing repairs on x9 of their GT 26’s across the UK.

 

The condition of the Exhaust Gas Housing was assessed prior to the works commencing by Salko and the customers representative welding engineers.

View full case study read more

Salko Electrical – Building Services Phase 1 & Phase 2

Woodsmith Project has been called the biggest mining project in Britain in decades.

 

Anglo American currently develops a polyhalite mine in a sensitive local landscape, the North York National Park.

View full case study read more

Salko Energy – OTC Tube Bundle Replacement

The end client engaged with Salko to assist with the full tube bundle replacement on their HP OTC (once through cooler)

 

The objective for the client was to install and operate with a brand-new full tube bundle replacement, to eradicate leaking issues they had previously had.

View full case study read more

Salko Commercial – Bespoke Operations Office

The end client wanted to convert part of a barn building into a bespoke mezzanine office to utilize the space available to a working office.

 

Heat recovery fan was installed to capture as much of the air temperature required for the space, an up to date hot and cold-water system was installed to the kitchen and toilet areas also.

View full case study read more

Woodsmith Mine – Dewatering systems

Anglo American is currently developing a develop Polyhalite mine in a sensitive local landscape, the North York National Park.

 

To receive permission for mine development the company must abide by strict environmental limits, which govern all activities during the construction phase.

View full case study read more

Woodsmith Mine – Ventilation systems

Anglo American is currently developing a develop Polyhalite mine in a sensitive local landscape, the North York National Park.

 

To receive permission for mine development the company must abide by strict environmental limits, which govern all activities during the construction phase.

View full case study read more

OTC Leak Search & Repair

The GT 26 low pressure and high pressure Once Through Coolers (OTC) reduce the temperature of the Gas Turbine’s cooling air systems.

 

This is through a heat exchange between the GT cooling air and water (steam) from the Water Steam Cycle.  Over operational time the OTC’s can develop leaks between the air and water sides. This leak of water into the cooling air system detrimentally  increases demin water consumption and has the potential to impact the cooling air ratios.  It can also lead to increased levels of corrosion in the system.

View full case study read more

Exhaust Gas Diffuser 1 Refurbishment

The GT 26 Exhaust Gas Diffuser is a segmented diffuser consisting of ten independent moving plates. These form an liner in the exhaust path to the HRSG.

 

Between the liner plates and the outer casing there is layered insulation matting. During the operation of the GT26 the EGD 1 liner plates will require repair.

View full case study read more

Sectors we work in...

Salko UK is a solutions provider for Mechanical and Electrical services into the Energy, Commercial, Industrial and Mining Sectors. We offer a range of services from design and supply, the provision of individual specialists, through to fully managed turnkey projects.

Salko delivers a breadth of specialist operational capabilities into a range of market sectors. By understanding our customer's needs, we apply our core strengths of technical expertise and experience to offer our customers a solutions partner.

Our main aim is to rely on a team of professionals with full dedication to the customer, a desire to learn, innovate and work as a team.

Learn more about how we work

Get in touch

Get in touch with our team at Salko UK

For a clear, honest appraisal of your next project. Just give us a call to get started on 01430 431977