Salko Energy – GT 26 Exhaust Gas Housing Repairs

Newark, UK

Project Background

Salko was engaged by the end client to complete critical Exhaust Gas Housing repairs on x9 of their GT 26’s across the UK.

Objective

The condition of the Exhaust Gas Housing was assessed prior to the works commencing by Salko and the customers representative welding engineers. An assessment report was subsequently issued to Salko to provide an understanding of extent of the required works, determining the full scope and complete the repairs on Exhaust Gas Housing as per the agreed repair recommendations.

The solution

Following a review of the assessment report, Salko supplied skilled supervision and labour, including in-house coded pressure welders to complete the required repair works. Salko worked closely with the customer to understand their requirements and throughout execution to deliver the project to their expectations. All fit ups and completed welds were subject to 100% visual inspection and DPI (Dye penetrant inspection).

Completed Works:

EGH Top Half Repairs:

1 10# LE/OD Patch Repair
2 8# LE/OD Patch Repair
3 7# LE/OD Patch Repair
4 #6 LE/ID Large Patch Repair
5 #6 TE/OD Strut Repair
6 #6 Strut Patch Reapir (Stiffening Pipe)
7 #7 Strut Patch Repair (Stiffening Pipe)
8 #7 TE/ID Strut Repair
9 #7 TE/ID Large Patch Repair
10 #8 TE/OD Strut Repair, Patch either side of the horseshoe
11 #9 TE/OD Strut Repair, Full strut replaced with Patches either side of the horseshoe
12 #9 TE/ID Strut Repair, Full strut replaced with Patches either side of the horseshoe
13 #9 Strut Patch Large Repair (Stiffening Pipe)
14 #9 ID/OD Patches either side of the horseshoe, see #11,12
15 #10 Strut Patch repair (Stiffening pipe)
16 #10 TE/OD Strut repair with patches either side of the horseshoe
17 New Flare installed, full half
18 New inner and our split lines fabricated and installed. (Rooted)
19 New compensating pads fabricated and installed
20 New stiffening pipes installed; split lines will be installed during the outage
21 Nose cone cracks repaired, new goal post (Hooks) fabricated and installed
22 New Membrane seal installed and locking tabs welded
23 General Cracks repaired in various locations

 

EGH Bottom Half Repairs:

1 #1 LE/TE Large Patch Repair, Strut to split line
2 #1 Strut Patch Repair (Stiffening Pipe)
3 #2 TE/ID Full Strut replaced
4 #2 TE/OD Full Strut replaced
5 #2-#3 Large Patch Repair
6 #2 Strut Patch Repair (Stiffening Pipe)
7 #3 Strut Patch Repair (Stiffening Pipe)
8 #3 TE/OD Strut repair with patches either side of the horse shoe
9 #4 TE/OD Strut repair with patches either side of the horseshoe
10 #4 Strut Patch Repair (Stiffening Pipe)
11 #5 TE/ID Liner large patch repair
12 #5 LE/ID Liner large patch repair
13 #5 Strut Patch Repair (Stiffening Pipe)
14 #5 TE/ID Full Strut Replaced with Patch one side of the horseshoe
15 #5 TE/OD Full Strut Replaced with Patches either side of the horseshoe
16 #5 LE/ID Liner large patch repair
17 #4 LE/ID Liner large patch repair
18 #2 LE/ID Liner large patch repair
19 #5 Strut Patch Repair (stiffening Pipe)
20 #1 LE/ID Liner Patch Repair up to the Split line
21 #1 LE/ID Large Patch Repair up to the Split line
22 #1 LE/OD Patch Repair
23 #1 TE/ID Large Patch Repair up to the split line
24 New Flare installed, full half
25 New inner and our split lines fabricated and installed. (Rooted)
26 New compensating pads fabricated and installed
27 New stiffening pipes installed, split lines will be installed during the outage
28 Nose cone cracks repaired, new goal post (Hooks) fabricated and installed
29 New Membrane seal installed and locking tabs welded
30 General Cracks repaired in various locations

 

Salko Key Data:

Country, Location: Newark, UK
Project Execution: Jan – Feb 2023
Application: Energy
Key Project Activities Pre-planning, procurement, Logistics, Installation, Quality Reporting

 

 

 

 