Salko was successful in being awarded a contract to supply Quality Surveillance Engineers (QSEs) to ESB Carrington to support with their major overhauls of the Gas Turbine, Steam Turbine and Generator.
The QSE’s were embedded in the ESB team for the project, with the support being a success for both parties. Through the diligence of the engineers at least two major quality findings were picked up by the team, which could have led to future shutdown of the units. The team formed an excellent relationship with the onsite ESB team and received praise for their professionalism and vigilance.